Skip to content

Invoice basics

Invoice vs estimate

Two documents that look almost identical and mean completely different things. One is a proposal. The other is a bill. Sending the wrong one is an awkward conversation.

Last reviewed August 13, 2026

An estimate is what you expect a job to cost, sent before the work is agreed. An invoice is a request to be paid for work already done. Same layout, opposite direction: one asks for a decision, the other asks for money.

What actually changes between them

Most of the document is the same — your details, their details, line items, totals. The differences are small and all of them matter.

EstimateInvoice
SentBefore the work is agreedAfter the work is done
Asks forA yes or a noPayment
Second dateAn expiry date — how long the price holdsA due date — when payment is expected
NumberingIts own sequence, so estimates that go nowhere leave no gapsIts own sequence, unbroken and unique
DepositsStated as a condition of bookingShown as already received, reducing the balance
Tone of the amountsA price you are offeringA figure that has already been earned

Estimate, quote, or proposal?

These words get used interchangeably and it causes more confusion than the invoice question does. In everyday trade usage:

  • An estimate is a considered guess. The final figure may move if the job turns out differently.
  • A quote is usually understood as a fixed price for a defined scope.
  • A proposal is a quote with the reasoning attached — common in consulting, rare in the trades.

Two things are worth being clear about. The word on the document is not what makes a price binding; the agreement you reach with your customer is. And whether a given price commits you legally depends on that agreement and on the law where you are — which is exactly why the document should say, in plain words, whether the figure is fixed or indicative.

The workflow most service businesses end up with

  1. Look at the job. On site, on a call, or from photos.
  2. Send the estimate, with a scope and an expiry date. Two weeks is a common window and protects you from someone accepting a six-month-old price after your costs have moved.
  3. Get a yes in writing. A reply to the message is enough for most small jobs. For anything with a deposit, get the deposit.
  4. Do the work, and note anything that changed as it happens rather than reconstructing it later.
  5. Invoice against the estimate. Same line items, in the same order, so the customer can hold the two documents side by side. Anything added goes on as its own line, described as agreed on the day.

Example

The same job, twice

An estimate for a fence replacement, then the invoice that followed it. Note that the invoice keeps the estimate's line order and adds the extra work as a separate, dated line.

Estimate EST-0018 · valid until 30 June 2026

Remove and dispose of existing fence18 linear metres
$340.00
Supply and install closeboard fencing18 linear metres @ $58
$1,044.00
Concrete post fixing10 posts
$160.00
Estimated total
$1,544.00

Prices held for 30 days. A 25% deposit confirms the booking. If a post base needs excavating below 600mm, that will be quoted separately before any additional work starts.

Invoice INV-0091 · due 21 July 2026

Remove and dispose of existing fence18 linear metres
$340.00
Supply and install closeboard fencing18 linear metres @ $58
$1,044.00
Concrete post fixing10 posts
$160.00
Additional excavation, posts 4 and 5Agreed on site 8 July, 2 hrs @ $45
$90.00
Total
$1,634.00
Deposit received 22 June
−$386.00
Balance due
$1,248.00

When the job changes

This is where estimates earn their keep and where they most often go wrong. If the work grows, the moment to say so is when it grows — not on the invoice. A message on the day (“the post bases need digging deeper, that’s another two hours at $45, happy to go ahead?”) turns a surprise into an agreement, and the invoice line then just records something the customer already knows.

On larger jobs this is formalised as a change order, which is worth doing properly — the contractor page covers how that flows onto the final invoice. On small jobs, a text message is genuinely enough, as long as it exists.

Do you need both?

It depends entirely on whether your customers know the price before you start.

  • Fixed, published prices — a tutor at an hourly rate, a cleaner on a standing weekly job. Invoice only. An estimate adds a step that answers nothing.
  • Variable work you price after looking — repairs, garden work, decorating, most handyman jobs. Both, always.
  • Booked work with a deposit — weddings, events, multi-day projects. Both, and the estimate is doing the heavier job of the two.

Once the job is done, the mechanics of the bill itself are covered in how to invoice for services and what to include on an invoice.

Quote it, then bill it

Invoice Tiger handles estimates and invoices with the same workflow and keeps their numbering separate, so quoting a job costs you nothing extra.

Coming to the App Store